UAE

Dubai RTA Begins Tunneling for 30km Metro Blue Line Project

By 19Network Editorial Team · May 4, 2026 · 2 min read

Dubai RTA Begins Tunneling for 30km Metro Blue Line Project

The RTA starts underground tunneling for the 30km rail link connecting the Red and Green lines with 14 new stations.

The Roads and Transport Authority (RTA) has officially commenced tunneling operations for the Dubai Metro Blue Line, a 30-kilometre extension designed to link existing networks and serve growing residential hubs. This expansion connects the Red and Green lines, introducing 14 new stations to the city’s rail infrastructure. Integration and Route Expansion The Blue Line functions as a strategic link between the current terminal stations of Al Rashidiya on the Red Line and Al Jaddaf on the Green Line. Of the 30-kilometre total length, 15.5 kilometres will run underground at depths reaching 70 metres, while 14.5 kilometres will consist of elevated tracks. The project includes the construction of nine elevated stations and five underground stations. Key areas slated for integration into the metro network through this project include Dubai Creek Harbour, Dubai Festival City, International City, Dubai Silicon Oasis, and Academic City. The RTA expects the line to serve approximately 320,000 new passengers daily upon completion, significantly reducing travel times between these major commercial and academic districts. Technical Infrastructure and Timeline The tunneling phase utilizes specialized Tunnel Boring Machines (TBMs) to navigate the subterranean segments without disrupting surface traffic or existing utilities. The project involves one of the largest interchanges in the network at International City, supporting the high-density residential population in that sector. Current…

Source: Gulf News

Read on 19Network