UAE

Dubai Approves $9.2bn Underground Gold Line Metro Project

By 19Network Editorial Team · Apr 23, 2026 · 2 min read

Dubai Approves $9.2bn Underground Gold Line Metro Project

The Dh34 billion rail project will span 47 kilometers and 24 stations to expand the city's mass transit capacity.

Dubai has approved the construction of the Gold Line metro project, a Dh34 billion ($9.2 billion) transport initiative that will be built entirely underground. The new line is designed to enhance the city’s rail infrastructure and manage increasing traffic demands as part of the Dubai 2040 Urban Master Plan. Project Scope and Capacity The Gold Line will span 47 kilometers, connecting 24 stations across the emirate. Unlike the existing Red and Green lines, which feature elevated tracks, the Gold Line will operate completely beneath the surface. This design choice aims to minimize disruption to existing urban density and high-value real estate corridors. The project is expected to carry several hundred thousand passengers daily upon completion. It serves as a major expansion beyond the recently announced Dh18 billion Blue Line project, which is currently in its preliminary development phases. Strategic Integration The Roads and Transport Authority (RTA) will oversee the development, which connects established residential districts with emerging commercial hubs. The project aligns with Dubai’s objective to ensure 55% of the population lives within 800 meters of a mass transit station. The tender process for the construction is expected to attract major international engineering firms, following the procurement model used for the Blue Line. Completion dates and specific station locations are anticipated in the next phase of RTA announcements.

Read on 19Network