UAE
Dubai Approves $9.2bn Fully Underground Gold Line Metro Project
By 19Network Editorial Team · Apr 23, 2026 · 2 min read
The AED 33.8 billion project will be built entirely subterranean to expand city's rail capacity.
Dubai has approved the construction of the Gold Line metro project, a $9.2 billion (AED 33.8 billion) rail development that will be built entirely underground. The new line expands the city’s existing transit network, joining the operational Red and Green lines and the recently announced Blue Line project. Network Expansion and Routing The Gold Line is designed to link several high-density residential and commercial districts, though the Roads and Transport Authority (RTA) has yet to release the official map of the 10+ stations expected for this route. Unlike previous lines that feature elevated viaducts, the Gold Line’s fully subterranean design aims to minimize disruption to existing surface infrastructure and high-value real estate corridors. The project arrives as Dubai targets a 50% increase in public transport usage by 2030. Industry analysts suggest the $9.2 billion investment will likely be managed through a series of international tenders for tunneling, rolling stock, and automated signaling systems. The timeline for the project aligns with the Dubai 2040 Urban Master Plan, which projects a population surge to 5.8 million people. Economic and Infrastructure Impact Totaling significant expenditure, the Gold Line represents one of the largest single infrastructure investments in the emirate’s history. It follows the AED 18 billion Blue Line contract, which spans 30km and is scheduled for completion in 2029. The Gold Line is expected to alleviate congestion on major…